OBJECTIVE                                                                                               

Director/VP/Plant Manager of Operations/Manufacturing in chemical, pharmaceutical, aerospace materials or other manufacturing industry.

SUMMARY

Experienced operations/manufacturing leader specializing in turnarounds and start-ups in businesses facing challenging marketplaces.  Proven track record in continuous improvement with a focus on increasing productivity/quality/safety while dramatically lowering operating costs.

EXPERTISE HIGHLIGHTS

Proven Leader

·     29 years in manufacturing operations, 15 years in general/executive management of multi-site, multi-plant, batch and continuous operations.

·     Led turnaround of two acquired manufacturing sites.  In both sites, realized 40-50% productivity gains while reducing costs 25-30%.

·     Elevated customer satisfaction 80% through aggressive quality/delivery improvement and intensive communication enhancement.

·     Reduced injury rates by 75-90% in 3 separate plants using behavior-based safety and culture modification programs.

·     Achieved 60% increase in productivity to attain the best-in-class automotive coatings plant in the NAFTA region.

·     Launched three major start-ups, each involving $25M+ facilities with innovative processes and staffing configurations.  All three were on-time, on-budget and injury free.

·     Led the safe closure and integration of 3 manufacturing facilities with no reduction in customer service level.

·     Provided formal and informal mentoring to new-hire engineers and junior managers.

·     Experienced in GMP/FDA and Military Spec plants.

 Change Catalyst

·     Achieved impressive improvement in the areas of quality, productivity, safety and cost reduction for the last 15 contiguous years.

·     Early adopter of Lean Manufacturing, Kaizen, 5S, Six Sigma and Behavior Based Safety.

·     Implemented planned cultural change program in two acquired sites to achieve dramatic improvements in safety, quality, productivity and housekeeping.

·     Developed and implemented 6 bottom-to-top re-engineering efforts to deliver capacity increases of 60% - 100%.

·     Implemented a new quality model to raise first-time quality by 100%.

·     Guided the implementation of enterprise resource management software (SAP) and a new MRP model to deliver increased on-time delivery and double-digit reduction in material inventories.

Innovator

·     Chief design engineer for the successful research/start-up/optimization of one of the world's largest aerospace carbon fiber plants with a capital project cost of $25M.

·     Guided the development and introduction of innovative dispensing systems in coatings and automotive catalysts businesses.

·     Used expert level programming skills in SQL, Access, Visual Basic, PHP, and HTML to develop various systems to leverage data for business improvement.

·     Developed innovative process monitoring software and the associated plant management techniques based on the theory of constraints resulting in 70% increases in batch productivity. The system was cross-licensed and marketed to paint companies in the U.S.

·     Patent Pending holder of innovative method for raising safety awareness through daily email safety messages.


EXPERIENCE SUMMARY details next section

10   -            Site Manager, Hexcel Corporation, Decatur AL
General Manager for all
a large chemical facility making intermediates for the aerospace and wind power composites industries.

07   -   10     Site Manager, BASF Catalysts, Huntsville AL
General Manager for all functions of a vehicle and stationary catalyst manufacturing and product development operation.

03   -   07     Site Manager, BASF Corporation, Decatur AL
General Manager for all functions of a large industrial coatings manufacturing operation.

95   -   03     Site Manager, BASF Corporation, Morganton NC & Grand Rapids MI (‘95-‘99)
General Manager for all functions of a multi-plant site making automotive and industrial coatings.

94   -   95     Production Manager, BASF Corporation, Morganton NC
Production Manager for automotive and industrial liquid coatings plant.

85   -   94     Senior Process/Project Engineer, BASF Corporation, Rock Hill SC & Morganton NC
Chief engineer for design/implementation of new process technology for aerospace carbon fiber production. Process and project work at the Morganton plant.

81   -   85     Process/Project Engineer, Abbott Laboratories, Rocky Mount NC
Engineer for design/installation of FDA regulated sterilizers, filling equipment and distilled water generation for IV drug plant.  Trained in GMP and FDA certification process.

78   -   81     Co-op Design Engineer, BMA Consultants, Raleigh NC
Design engineer for HVAC and process piping for institutional buildings

EDUCATION

04   -   07     M.B.A. Gardner-Webb University, Boiling Springs NC

76   -   80     B.S. Mechanical Engineering, North Carolina State University, Raleigh NC

OTHER SKILLS & AFFILIATIONS

·       Chairman, Manufacturing Committee, National Paint and Coatings Association, 2005 - 2007

·       Editor and Owner, dailySAFETYmessage.com

·       Expert level in Office, Access, SQL, Visual Basic programming, Web Design, PLC programming.

·       Intermediate level in Java programming, Linux, web server administration, SAP, network management.

·       Graduate of Manchester Pro Coaching executive leadership program with high marks in coaching and strategic thinking

EXPERIENCE DETAILS

07   -            Site Manager, BASF Catalysts, Huntsville, AL

·  Led turnaround of an acquired manufacturing site achieving 50% productivity improvements and lowering cost 25%.

·  Reduced injury rates by 70% using behavior-based safety programs based on peer-to-peer observations.

·  Halved scrap generation rates and dramatically improved precious metal control.

·  Led support of global manufacturing with engineering and manufacturing expertise in South Africa, China, India and Brazil.  Mentored site managers at these sites on continuous improvement programs.

·  Led product develop group for new product introduction at global manufacturing sites.

·  Installed an innovative Customer Welcome program that uses plant operation tours and hospitality as a sales tool.

·  Oversaw the start-up of $25M new line and a $15M per year capital budget.

·  Led the 500 person Huntsville site with the mission of local manufacturing of automotive and heavy equipment catalytic converters

 

03   -   07     Site Manager, BASF Corporation, Decatur AL

·  Led turnaround of an acquired manufacturing site realizing extraordinary gains in all areas in only 24 months.  Delivered 60% batch productivity gains while reducing costs 25%.

·  Reduced injury rates by 80% using behavior-based safety program based on peer-to-peer observations.

·  Reduced Cost of Poor Quality by 37% through error control, poke yoke, Kaizen events and operator & supervisor coaching.

·  Created various cultural change initiatives resulting in dramatic improvements in quality, safety, housekeeping and morale.  Extensive face-time with plant personnel through “walking around” and 35 communications meetings per year.

·  Fostered striking improvement in Sales and Manufacturing relationships through open, extensive communication.  Hosted over 20 customer visit utilizing the plant as a sales tool.

·  Directed the formation of a quarterly Technical Exchange program facilitating improved cooperation and relationships among plant and design technical groups.

·  Rejuvenated employee recognitions and celebrations.  Held an employee event every month including, cookouts, ice cream events, off-site picnics and holiday safety dinners.

·  Increased dispersion in-spec rate to 99%, up from 85%, while executing the successful transfer of dispersion products from a sister plant.

·  Relocated the Color Formulation group from facilities in Ohio and delivered a doubling of productivity in the number of color formulations per person.

95   -   03     Site Manager, BASF Corporation, Morganton NC, Grand Rapids MI

·  Led project to build and start a $25M powder coatings plant. Project was injury free, on-time, on-budget, and on-quality. The new plant is based on self-directed high performance work teams.

·  Dual site responsibility for Grand Rapids MI and Morganton NC site from 1995 – 1999.  Led the closure team in transferring the products from Grand Rapids to Morganton and later the closing and decommissioning the Grand Rapids site.

·  Reduced emissions by 40% while increasing production to maintain EPA true-minor source status.

·  Led the team for transferring products from the Brantford Ontario site.

·  Established and led a Community Advisory Panel for the local area.

·  Guided the on-time, on-budget implementations of ISO 9000, QS 9000 quality registrations and the ISO 14000 environmental management registration.

·  Implemented a behavioral safety system to reduce injury rates by 75% and severity rates to zero. Program focuses on the day-to-day behaviors that often result in injury.

·  Increased productivity 60% by absorbing volume from three former plants without increasing headcount or fixed costs and without significant capital investment.

·  Initiated and conducted a site process optimization that led to numerous improvements.  This was a bottom-to-top total re-engineering effort.

·  Developed a monthly program of individual coaching for the plant management team.  Held annual seminars to teach leadership skills.

·  Designed and programmed a production batch tracking database.  The system allows supervisors and managers to optimize the number of batches in process and eliminate bottlenecks.  This was cross-licensed and marketed to paint companies in the U.S.

94   -   95     Production Manager, BASF Corporation, Morganton NC

·  Increased first-time quality 100% by implementing new quality model based on in-process testing rather than final inspection.

·  Developed a culture of continuous improvement by measuring key performance indicators and implementing action plans to drive improvement.


85   -   94     Senior Process/Project Engineer, BASF Corporation, Rock Hill SC, Morganton NC

·  Guided the R&D, design, installation and optimization of the world’s largest carbon fiber production line.  Responsible for all phases of the 4000ºF conversion process.

·  Developed process definition through the use of Design of Experiments and advanced statistical methods.

·  Optimized production processes to increase line capacity by 50%.

·  Designed and programmed an Oracle SQL based laboratory information management system.  Included on-line data acquisition from lab instruments and over 50,000 lines of program code.

81   -   85     Process/Project Engineer, Abbott Laboratories, Rocky Mount NC

·  Designed and installed new processes related to manufacture of IV drugs including FDA regulated sterilizers, filling equipment and distilled water generation.

·  Conducted numerous upgrades and certifications of sterilizers and IV drug filling equipment.

·  Reduced cycle times by 25% for intravenous drug sterilizers via automation.

78   -   81     Co-op Design Engineer, BMA Consultants, Raleigh NC

·  Increased engineers’ efficiency by programming a computer aided design package to automate HVAC calculations.

·  Designed energy management systems for utility savings at hospitals and university facilities.